Uphill ski tracks curve across a lightly snow-covered Montana hillside bordered by sunlit pines and dark evergreen forest.

Marshall Mountain Has No Lift This Winter, and the Old Lodge May Not See Another One

"Winter recreators will be protected from the elements with improved shelter and restroom facilities." That's how Missoula County Lands, Culture and Recreation Director Randy Arnold described the future of Marshall Mountain Park when the county announced a major federal grant on May 19, 2026.

None of that shelter exists yet. This winter the old ski hill east of East Missoula gives you snow, a slope and nothing else. The county's plan targets almost every missing piece, from drinking water to restrooms to a place to get out of the wind. Construction is expected to start in 2027, so the ski-era base you can visit this season is probably the last version of it with the original lodge and clock tower still standing.

A free hill with no ride up

Marshall Mountain Park is at 5250 Marshall Canyon Road, off Highway 200 between East Missoula and Bonner. It's free and open year-round from sunrise to sunset. The base area reopened on Aug. 12, 2021, for the first time in almost 20 years. Missoula County then used open space bonds to buy the full 480-acre park in 2024.

According to the county's park rules and FAQ page, uphill and backcountry skiing are allowed and cost nothing. The lift won't help you, though. Its chairs came off in 2023, the cable came down in 2025, and the county lists the lift as not operational. Every run starts with a climb.

For families with young kids, the small hills around the base building are the best spot. The county says they're good for sledding with small kiddos. Some older winter-use guidance banned sledding, so an outdated printout or screenshot may still say no. The current FAQ allows it.

Snow at this elevation is unreliable. The county posts conditions on its Instagram account, @marshall_mountain_park, so check it before you load the car. Last season's numbers show how thin the margin can be. In November 2025, Board of Missoula hosted a junk jam that got the first skiable three hours of the season only after organizers trucked in shavings from Glacier Ice Rink.

What the base doesn't have this winter

Bring everything you'll need, because nothing at the base area is set up for winter visitors right now. The county's rules and FAQ set out the conditions:

  • No indoor space. The lodge and base buildings are closed to the public.
  • No running water. Fill bottles and thermoses before you leave home.
  • No maintained winter terrain. The county warns that winter terrain is not maintained and hazards may exist.
  • No dogs, at any time, because of heavy recreational use and the way the trail system is designed.
  • No motorized use, and that includes e-bikes of any class.
  • No overnight parking or camping on Marshall Canyon Road or in the park lot.
  • Limited parking. The county recommends carpooling.

Getting there is up to you, too. The free Marshall Mountain Line shuttle from the downtown transfer center ran hourly on weekends during the 2026 summer season and ended on Oct. 31. From Canyon River, you'll be driving and finding a spot in the small lot.

Almost everything on that list is in the 2027 plan

The Base Area Redevelopment project has a total budget of $1,680,129.70. The May 2026 Land and Water Conservation Fund award of $838,722.89 covers about half and completes the funding.

Missing this winter Planned in the base-area redevelopment
No running water Drinking water restored on site
No public restrooms or indoor shelter Shelter and restroom facilities, plus shade
Original lodge closed and in disrepair Lodge and clock tower taken down
Old ski-lift remnants Old lift base turned into a shade structure
No central starting point A main trailhead and early-phase trails
Ski-era utilities Upgraded utilities and maintenance facilities

The lodge row matters most. Marshall Mountain Park Manager Jackson Lee told the Missoulian that the grant will directly pay to take down the lodge and clock tower. The other base building will stay and be used for operations. The Missoulian noted that the lodge has been closed to the public and has fallen into disrepair since the ski area shut down in 2003.

The county expects construction to start in 2027, with 2026 spent on final design and engineering. If that 2027 start holds, this winter is the clock tower's last season standing over the base. Lee summed up the project's purpose in the same Missoulian story: "This is moving us forward to act as what this place previously served, a community gathering space."

Neighbors are paying for a large share of it. The federal program requires a 50% local match. Friends of Marshall Mountain raised more than half of that match from community and private donors. The Missoula Mountain Bike Coalition is putting in a $40,000 Montana Trail Stewardship grant it won in 2025, and voter-approved trail and open space bond dollars cover the rest. According to the Missoulian, about $135,000 came from the open space bond and $176,000 from the county trail bond.

Construction is already underway on the trails

Work isn't waiting for 2027. Radius Trail Solutions is designing and building a new intermediate downhill mountain bike trail that runs from Hello Kitty all the way to the base. The trail carries a black diamond rating for adaptive mountain bikers. The crew is also finishing the multi-use loop around the base area. That work started in summer 2026 and is expected to run through spring 2027.

Since Oct. 19, 2026, the Local Glory trail has been subject to intermittent closures while crews build new trail entrances and a beginner jump line. If you hike up between storms, follow the posted signs and trail designations. The park rules also ban building your own jumps, ramps or obstacles on existing trails.

This work extends what has opened over the past two years. An easy-up trail for hikers and bikers opened in fall 2024, and a new double black tech trail called Marshall Arts opened in fall 2025. In the county's January 2026 "Marshall Mountain Dirt" newsletter, Missoula Adaptive Recreation and Sports riders took their first runs on Mission to Mars, which the county calls its first adaptive-friendly downhill mountain bike trail. The base-area rebuild in 2027 would add amenities to a park whose trail system is already growing.

The rail garden on the old bunny slope

One more base-area project is still taking shape. In November 2025, Missoula County commissioners approved a partnership with the nonprofit Girls on Shred to build a maintained freestyle ski and snowboard park at the base area, the Missoulian reported. In the same story, Marshall Mountain Park Ranger Silas Phillips described the history behind it: "For years, people and users have created their own freestyle features at the site, and this project would recognize the use and create basically a new winter recreation zone at the Marshall Mountain Park base area."

The plan, as NBC Montana reported, puts the Marshall Mountain Rail Garden on part of the old bunny slope. It calls for small, medium and large lines with professionally built and maintained features for all ages and abilities, all of it free to use. On Aug. 29, 2026, Marshall Fest brought local bands, DJs and a raffle to the mountain as a Girls on Shred fundraiser for the project, according to Montana Free Press. The Girls on Shred project page is still taking donations for tools, rails, boxes, fencing and signage.

Before the 2027 crews arrive, the base area off Highway 200 still has its ski-hill lodge and clock tower. This winter you can climb on skins where the lift once ran, sled beside the closed lodge, and see the clock tower against the snow. If you're thinking about a home in Canyon River with Marshall Mountain this close, Stephanie Nelson can show you how the lots and floor plans in each phase fit a winter spent outdoors. Start Your Canyon River Story.

Start Your Canyon River Story

We’re here to help you find your place at Canyon River, where home is more than a property. With local insight and personal support, your journey feels seamless and truly yours.

Follow Me on Instagram